Recent Projects
Extrusion machine build-to-print panel
A local extrusion machine company with a global footprint required three build-to-print panels within three weeks of project kickoff.
Thermal chamber performance tester
Commercial grade thermal insulation testing was required for production batches of customer containers (100% Inspection). Designed & developed system capable of testing seven units simultaneously.
Palletizer control system
A palletizer control system required complete facility removal due to obsolete controls.
Production conveyor control system
Four bottling production line conveyor control systems were over 30 years old and reliant on obsolete control hardware, which hindered operational productivity.
Pump pallet control systems
Six pump pallet electrical control panels were required within 3 months of project kick-off with upgraded design.